Fusion Utility Networks to Supply and install 175kVA electric connection for Aldi at Gresford Road, Llay, including HV Loop from POC to new 315kva package substation to be looped into BURTON Circuit from Llay primary S/S with 450meters of offsite Carriageway excavation.
Working closely with the Local Authority and Local Residents, Fusion Utility Networks and our ICP Rock power successfully made power to the ALDI store on schedule with as little disruption to the surrounding areas.
With Fusion Utility Networks coordinating the works from start to finish with appointed IDNO and DNO we have continued to maintained a great working relationship between Utility Connections and Aldi.